FINALLY, we were close....
We called up a sheet metal shop and had some lengths of .065 aluminum cut and bent to top off the retaining wall cap. We brought it home and cut/trimmed it to fit and installed with silicone adhesive and 3/16 pop rivets.
Then mounted up some signs we had in the old garage as well as some new....including a white rose gas pump replica in my Grandfather's memory. He owned and operated a corner station that sold white rose gas/ products in the 50's.
Then myself and neighbourhood guys started hauling in the lift for install...got the columns standing....
And that's about it.....that brings you up to date; where we stand today...hope to finish the lift in the next few days...as time permits.
Thanks for following us on our journey to get this sucker standing!!
Next is trenching in the gas line and installing the radiant tube overhead heater...moving in/building benches/cabinets etc etc.....but we have a building to work in now!!!!!!
