MopardudeWI
Well-known member
Going to be framing out the inside of my shop soon in order to insulate it. I have 2 wall sections like this (see my attachment) where the window is up tight to the post so i can't run any full length studs on that side. I also plan on putting ceiling joists that will sit on top of this wall. Can I make up the strength by lag bolting the top of the wall to the post or is there a better way to go about this?
