If you have access to a chain fall & some 1” line, I’d buy a 6 x 8 timber 16’ & make myself up a Gin Pole. When you’re done with it cut it up for landscape border or columns for a deck.

That was sort of how I did the 7x16x 20' long PSL beam for my garage......
![]()
HOLY **** !
What do you have above that, a pen for a couple of elephants ?


I am now trying to get the architect to speck out a steel I beam. I think it will be cheaper and faster. It would be 1 beam that I don't have to bolt together and assemble. As opposed to dealing with 5 smaller beams.
I checked around and there is a place close by that has the material lifts. It would cost me about $150 for the day for 2 of them. I think I will go that route being I have another large beam that I have to put up just not as big as that one. I could get them both done easily.
Thanks for all the awesome replys!!!
A pen??
Do they know how to spell? Let alone write.![]()
Definition of PEN (noun)
1) : a small enclosure for animals
I am now trying to get the architect to speck out a steel I beam. I think it will be cheaper and faster. It would be 1 beam that I don't have to bolt together and assemble. As opposed to dealing with 5 smaller beams.
I checked around and there is a place close by that has the material lifts. It would cost me about $150 for the day for 2 of them. I think I will go that route being I have another large beam that I have to put up just not as big as that one. I could get them both done easily.
Thanks for all the awesome replys!!!

A few people have mentioned come-alongs. If you use them for lifting, just be aware they are really intended for horizontal moving, not overhead lifting. They will work, but they aren't the safest way since the spool can unwind quickly if there is a problem with the catch mechanism. (I have experienced this with a cheap come-along.) A chain hoist is a safer approach.
I am now trying to get the architect to speck out a steel I beam. I think it will be cheaper and faster. It would be 1 beam that I don't have to bolt together and assemble. As opposed to dealing with 5 smaller beams.
I checked around and there is a place close by that has the material lifts. It would cost me about $150 for the day for 2 of them. I think I will go that route being I have another large beam that I have to put up just not as big as that one. I could get them both done easily.
Thanks for all the awesome replys!!!