I havent updated this in forever, as I havent worked on it in forever. Until recently.
In the last couple weeks Ive been working on the insulation, finally.
Ceiling -
Im installing R30 under the upstairs floor area. The rest will be R49 blown-in once the steel is up.
Im currently at about 60% done. Hoping to have the rest done either tonight or by sat pm.
Walls -
Started insulating the front of the posts, to keep any cold air from getting between the 2x6s they are made from (no they arent glue laminated).
Also I had some 25" gaps between all the windows and the posts. I used some 2" foam along the posts to bridge the gap vs trying to fill in a 2" piece of fibergass.
Finally, capped the walls between each truss with some 1" foam to help prevent cold air from pouring down into the walls. The way Im insulating them, fiberglass between the purlins, I thought itd be hard to seal without doing this. Even if it doesnt make a huge difference Im only out the $15 for a sheet of foam.
South wall all ready for insulation. I actually have about 50sqft done, just no pics.
Progress will hopefully be alot faster now. I hope.