Almost done air...and some tire storage too
Finishing up the air lines hopefully this weekend. Can't install the quick connects until next week as I had to order them. I ordered Milton V style couplers after reading on here of the benefits. What a pain it was to find a vendor local. Ironically the price beat the best I found on line.
Also ordered my magnetic starter and 3/4 regulator for the compressor. Soon be able to assemble and wire it up and do leak testing of all the air system. Can't wait
Also finally got my tire racks up. Frees up a lot of space on the floor too. It worked out really well without planning that the bottom of the tire rack is just over 6 feet off the floor with the top bumped up against the air line.
No smashing my head off here (at 6' myself)
The last 2 pics are of the air line under my welding table. It ends at a quick connect that will have a flexible hose run from it to the hard pipe on the welding table that will feed the manifold block that will be mounted at the front of the welding table (last picture mocked up). Still have to straighten the air line a tiny bit (ran out of time before work) and make a bracket to hold the manifold to the table as I couldn't get one with rear feed and holes to mount it. Luckily I now have use of my brake (as apparent by the bracket in picture I made to secure the air line under the table. I also made one for the termination by the compressor). I LOVE having the proper tools to do the job finally.
Finishing up the air lines hopefully this weekend. Can't install the quick connects until next week as I had to order them. I ordered Milton V style couplers after reading on here of the benefits. What a pain it was to find a vendor local. Ironically the price beat the best I found on line.
Also ordered my magnetic starter and 3/4 regulator for the compressor. Soon be able to assemble and wire it up and do leak testing of all the air system. Can't wait
Also finally got my tire racks up. Frees up a lot of space on the floor too. It worked out really well without planning that the bottom of the tire rack is just over 6 feet off the floor with the top bumped up against the air line.
No smashing my head off here (at 6' myself)The last 2 pics are of the air line under my welding table. It ends at a quick connect that will have a flexible hose run from it to the hard pipe on the welding table that will feed the manifold block that will be mounted at the front of the welding table (last picture mocked up). Still have to straighten the air line a tiny bit (ran out of time before work) and make a bracket to hold the manifold to the table as I couldn't get one with rear feed and holes to mount it. Luckily I now have use of my brake (as apparent by the bracket in picture I made to secure the air line under the table. I also made one for the termination by the compressor). I LOVE having the proper tools to do the job finally.