Last month we worked on saving the small shed by putting it on a trailer and moving it out of the way. The new shed will be close to being in the same spot as the old one.

Last Thursday we had 30 loads of fill hauled in, leveled, and compacted. In 30ft I had 4.5ft of fall.





The small shed was saved and will be turned to run the same direction as the new shed. Won't be dealing with that shed till next spring.
Sent from my SM-G930R4 using Tapatalk

Last Thursday we had 30 loads of fill hauled in, leveled, and compacted. In 30ft I had 4.5ft of fall.





The small shed was saved and will be turned to run the same direction as the new shed. Won't be dealing with that shed till next spring.
Sent from my SM-G930R4 using Tapatalk
Attachments
-
09454d1e0d19230064afdb172338ee98.jpg93.1 KB · Views: 0 -
94432356908c6cce26d6cb2885d7ae1f.jpg110.9 KB · Views: 0 -
1f9ff27323452da873295940060b0e54.jpg133.8 KB · Views: 0 -
ddae8a3a22ce962dc4580632cf5f8ace.jpg93.5 KB · Views: 0 -
187352b258e6f9e9bc74d17d1429f5c9.jpg104.1 KB · Views: 0 -
2fad1a14bac6177398d638ed0e3989eb.jpg103.7 KB · Views: 0
Last edited:




























