Friartuck
Well-known member
I have two designs for laying out the pex tubing for a 24 X 36 slab.
In Layout #1 the loops are evenly spaced and their lengths are fairley equal. Layout #2 the loops are closer together around the perimeter to provide a higher concentration of heat where the heat loss is greater and larger spacing towards the center where heat loss is much less. The assumption is full 2 inch foam under the slab and around the inside perimter of the foundation.
Ignore the sharp bends on the graphics. Powerpoint doesn't do curves that easy.
Any comments on either??
Chris
In Layout #1 the loops are evenly spaced and their lengths are fairley equal. Layout #2 the loops are closer together around the perimeter to provide a higher concentration of heat where the heat loss is greater and larger spacing towards the center where heat loss is much less. The assumption is full 2 inch foam under the slab and around the inside perimter of the foundation.
Ignore the sharp bends on the graphics. Powerpoint doesn't do curves that easy.
Any comments on either??
Chris