cbacres
Well-known member
I’m going on two years on mine, but I bought most of the parts, so I get some credit.
Now, if I could just buy some time.
Now, if I could just buy some time.
Put a floor in from scrap. Also when testing the air, I realized a shutoff valve would be better than just using the quick disconnect.


Easy walker. Around 1/2:12What's the pitch on the roof? Is it an easy walker, or pretty steep?
10 months is better than 10 yrs.I can’t wait to get my cabinet done, my two day project has been on hold for 10 months.
As for adding color to projects, I keep seeing fingers, if I wore your style safety shoes, I would be missing toes by now.
Your setup is definitely the bomb Don.Jim and Shorty
I solved all those problems with my 10' shipping container turned blast cabinet.




Blood? No idea what you meanAnd no blood ?
Not really. I cheated. The dolly was from my short Lista. I just had to splice in 2” pieces on two sides. Having the new weld cart and weld bench setup makes for a lot quicker work. The drill/tap also greatly reduced the time.Looks like someone found another gear. Go Shorty go
I think this will work in a pinch. 

A couple of years ago when I was 30-ish, I could carry a queen mattress by myself.
Thanks for stopping in to slum with us Crackers. John Bob is fitting in just fine. Checked out your project thread, wow, nice work.Merry Christmas, Shorty; it was fun having you on the forum 1n 2021; John is lucky to have you as a friend and neighbor.



“John Bob”Thanks for stopping in to slum with us Crackers. John Bob is fitting in just fine. Checked out your project thread, wow, nice work.