made some headway on the mega bench. turns out the top that I thought was 5/8 is only 7/16".....
cut a bunch of receiver tubing and going to town making attachments and multiple mounting locations for things like, 8" grinder, 6" grinder, belt sander, Pipe vise, tubing bender, engine stand holder ( also for rebuilding transmissions), Vise mount, etc.
I cut off the one smaller electrical cabinet. the bigger one I'm not quite sure if I'm going to install shelving inside of ti for storing welding supplies, or wire it up as a central connection box for the three welders and plasma... time will tell on that one... right now its on the backside, with only 2" of overhang. front side has 4".
front right corner will have three hitch setups as that is the most used corner. probably have two on the left side front and then one on each side at the back edge. welded some 1/2 nuts for taking up the slop in the receiver.
I haven't burnt any 7018 in about 20 years. Instead of using my old tombstone, I gave the Everlast 250DX tig machine a try with some stick rod. the rod is probably 15-20 years old. lol
Picked up a brand new reed 4" pipe chain vise off ebay for 50 bucks the other day.
now, I just need to weld up some mounting plates, and then make some 2.5" storage receivers that I can weld on the legs to store everything out of the way.