Finally after a long wait the slab has gone down.

ade1794a7741195bbb76e20186348447.jpg


c906b03943b823ea08d407142fbf06a8.jpg


a597263d116f503c93c74c963ae8df3b.jpg


38b56ab45d8aa5b3770d8c6d86723688.jpg


Pics aren't the best due to it being a strangely sunny day.
 
To avoid these ads, REGISTER NOW!

Padi

Active member
Joined
Apr 13, 2011
Messages
26
Looking good Az, looks like they even managed to get some of the concrete in the hole too! When's the roof due?
Cheers Chris.
 
OP
A

azmontana

Well-known member
Joined
Jul 24, 2015
Messages
82
RSJ is going up on Monday. Roof should start next week. Around 2 weeks left on the garage I reckon. Then onto paving the drive and most of the back garden.

b8431e330b3d1cfa9f1a22e06cee164d.jpg


Started buying some stuff to kit out the garage with. Had to grab this industrial cabinet complete bargain at £50 [emoji2]
 
OP
A

azmontana

Well-known member
Joined
Jul 24, 2015
Messages
82
very nice build, though looks small for a 3 car garage, unless you mean 3 small cars ;-)


It will store 3 cars. But for the time being will be for two cars. One for driving and the other spot for a car to be worked on.
 

Padi

Active member
Joined
Apr 13, 2011
Messages
26
Looks good Az, I can't believe this is only 2 months! You are giving me faith mine could be up pretty quickly, that is if the solicitors ever get off their thumbs and complete the paperwork on our purchase!

Cheers Chris.
 
OP
A

azmontana

Well-known member
Joined
Jul 24, 2015
Messages
82
Looks good Az, I can't believe this is only 2 months! You are giving me faith mine could be up pretty quickly, that is if the solicitors ever get off their thumbs and complete the paperwork on our purchase!

Cheers Chris.


Fingers crossed for you mate. Good luck.
 
OP
A

azmontana

Well-known member
Joined
Jul 24, 2015
Messages
82
RSJ went up today took a lot of effort as it weighs well over 500kg.

68859c99df9e6feb36be8713c02d0333.jpg


Eagle eye among you will probably have noticed the height of the garage has been reduced. [emoji20]

Some pics of how it was done.

37c601b0ae08ee1d4f80b202811e7ecb.jpg


2f1150d744e0ca2f8d199d86083b4ae0.jpg


eadb669d5e4da33b348d5b8353c036d3.jpg


9c2278fc3bbc129732ac3b2dcacb99bd.jpg
 
Last edited:

Padi

Active member
Joined
Apr 13, 2011
Messages
26
Looking good Az. Why was the garage reduced in height? On purpose or by accident?
Cheers Chris.
 
OP
A

azmontana

Well-known member
Joined
Jul 24, 2015
Messages
82
Front bricks on top of the RSJ and half of the roof construction is done. Hopefully by the end of next week it should be finished. [emoji2]

c00195d0cdac52bc9b9c79085d75610f.jpg


4056300742a312ce4074cb4e955944d0.jpg
 

Padi

Active member
Joined
Apr 13, 2011
Messages
26
Looks good Azmontana. How are you going to cover the roof? Will it be OSB and then tiled?
Cheers Chris.
 
OP
A

azmontana

Well-known member
Joined
Jul 24, 2015
Messages
82
Hip roof structure complete

fbc8232df6791f0de0ee8f5de0f26c64.jpg


Roof membrane should be on by the end of the week and roller shutter and door ready for the end of next week so I can finally start organising and getting all my tools in there.
 

Padi

Active member
Joined
Apr 13, 2011
Messages
26
I can't believe how quickly this has moved on, well done! Can I ask how long it took to get through planning? We're finally getting the keys to our new place on Friday after a hugely stressful move, and I need to get on ASAP so I can get my collection inside. Just wondering how long I should really allow for.
Cheers Chris.
 
OP
A

azmontana

Well-known member
Joined
Jul 24, 2015
Messages
82
I can't believe how quickly this has moved on, well done! Can I ask how long it took to get through planning? We're finally getting the keys to our new place on Friday after a hugely stressful move, and I need to get on ASAP so I can get my collection inside. Just wondering how long I should really allow for.

Cheers Chris.


After getting your architectural drawings sent to the council around 8 weeks for the decision.
 
To avoid these ads, REGISTER NOW!
OP
A

azmontana

Well-known member
Joined
Jul 24, 2015
Messages
82
Crappy weather has slowed progress I was hoping tiling would be started this week.

bfafc65b4d543d23cdc71441b3551810.jpg


First inside shot, the floor will be grinded next week to get an even finish.

f3dfc567fc4c178618309a7d3bcee738.jpg
 
OP
A

azmontana

Well-known member
Joined
Jul 24, 2015
Messages
82
75b9d97ea8f6a72f85d22ce0b1fd8469.jpg


Tiling has begun. Over 700 tiles need to be laid. Will take a good few days I reckon. Weather tomorrow looks dry but next week is looking pretty rubbish. [emoji20]
 

Padi

Active member
Joined
Apr 13, 2011
Messages
26
Looking good there, i cant wait to see the finished product. are you putting in an up and over door or roller door?
Cheers Chris.
 
OP
A

azmontana

Well-known member
Joined
Jul 24, 2015
Messages
82
Looking good there, i cant wait to see the finished product. are you putting in an up and over door or roller door?
Cheers Chris.


It will be a roller shutter. I can't wait to paint the walls and kit it out.
 
OP
A

azmontana

Well-known member
Joined
Jul 24, 2015
Messages
82
Tiling nearly there hips just need to be fixed.

eb85d4e3fb4d66013272069fa07007af.jpg


Shutter has been installed.

98d9a6598ba9915b6821e055b1522a2b.jpg


Tasks left to finish of the garage.

Hips on the roof to be installed
Guttering
Floor needs grinding to a smooth finish
Electrics including 2x32A commando sockets, lights, 13A sockets etc
Steel door to be installed

After the above is done I'll be ready to move in to finish it off tasks such as.

CCTV install
Painting the walls
Making my workbench
Kitting it out with my tools

.... Then deciding which of my cars gets space. I'm thinking the E36 M3 and the Hartge H26, the H26 requires some attention to get it up to factory condition.
 

Padi

Active member
Joined
Apr 13, 2011
Messages
26
Looks good, Cant wait to see this finished now. Can i ask where you are up to financially with it?
Cheers Chris.
 

Brit6

Member
Joined
Jul 10, 2013
Messages
14
Wow, that would never be allowed in US or Canada. The rain water will go into the neighbours yard!
 

Martin F

Well-known member
Joined
Apr 27, 2014
Messages
50
Location
Essex, UK
Wow, what a great size garage and gone up in good time as well.

Bet you must be itching to get in there and start the fitting out.
 
OP
A

azmontana

Well-known member
Joined
Jul 24, 2015
Messages
82
Wow, what a great size garage and gone up in good time as well.

Bet you must be itching to get in there and start the fitting out.


I really am. It's pretty much done now the floor needs a final grind and then sealed and then I come move in. Final hurdle is sorting out the driveway. I hope to get my cars in there in around two weeks.

1cf6f2bb508b8edc542b0910a6141ded.jpg


Let there be light! I've also installed two 32A sockets one for the air compressor and one for the mig welder [emoji2]

Chin up bar also installed so I can start getting back into shape. Really cool bar as you can mount a punch bag on the side.
 