Ok, we have made quite a bit of progress since the last post. We are now getting painfully close to finishing.
Exterior, painted, new concrete on backside poured, cedar beams sealed, RV hookups complete.
*********Need to re-hang drains and install rain chain. Need to buld the "dog house" for my air compressor and generator.
Garage doors being installed as I type this.
*Kitchen, flooring in, cabinets in, HVAC is complete.
*Bedroom, flooring in, closet complete and lined with cedar, HVAC in.
*Bathroom, flooring in, cabinets in, shower tiled now
******** waiting for shower door.
*Work out room, flooring in, HVAC complete, almost ready for equipment.
*Mancave, floor is in, HVAC in, painted, and beams sealed.
*********Ready for me to make a "feature" wall with the left over wood we milled and begin building my stereo cabinet.
Garage shop, gas heaters installed and tested, all lights in, garage doors going in. ***********Will need to touch up paint and build a staircase to the upper level storage area.
**********Need to decide on a car lift, thinking about a 4 post lift.