Already have 2 rods at the house, likely will have to redo the wire (currently tied into the existing meter pan) but have a short spool of that already.Don't forget wire and rods for grounding at both the main and house
Basically just need to decide where I want the new meter and start digging. Ought to be interesting when the PoCo stops to review, I discovered yesterday the pole and guy lines have quite a bit of movement in them. I wish I knew what their long term plans were, the high voltage line thought the woods that feeds ~12 houses really needs some TLC and some heavy trimming. Given how steep the terrain is I wish they'd move it to the main road and feed the loop from the other end. Only 2 houses would need to be reconnected but would eliminate about 8 poles worth of unreliable overhead.