Haven't done much of anything lately until today.
To start, I got a few parts together for putting together a drain and refill system for my CNC table.
And here's a mock-up. I need to buy a transfer pump and wait for my stainless hardware to arrive so I can mount the flanges and glue everything together.
Water from the table will drain through 3/4" PVC into the reservoir below, but only after it runs through an in-line filter I've got in place.
The threaded plug at the bottom of the reservoir will receive a 1/2" barb where I'll run a soft line to a transfer pump, and the outlet of that pump will go up the second ball valve to act as a means of refilling my table.
Another item that showed up was a torch mount from Beck's Armory. When I got the mount, I quickly saw what an improvement the clamp-style is on this versus my factory one.
Rather than creating pressure points with it's V-style clamp, the new mount is sized for specific torches.
Last but not least, I cleaned up the garage as best as I could.
Before today, you could barely walk through as I had boxes and hardware everywhere since I had disassembled my plasma table and squared everything up all over again.
One of the fabbed up bumpers gets picked up in a few weeks, the air compressor will go back to its respective spot, and hopefully my Z-axis assembly should arrive. I was running into a small binding issue and when I asked about what parts to order for rebuilding it, Langmuir opted to extend my warranty and send me a complete new one.
The old one.