In my new shop, I had them pull in a 100 amp 240V subpanel, as well as wire two 240V outlets, 8 ga wire, on 50 amp breakers. (one circuit for the compressor, one for the welder). As I read the code, I could have gone to a 55 amp breaker, but the contractor would not go bigger on the breaker...