  1. S

    I think I screwed up

    Brewchief I read all of the guidelines for the CSST and did run it in conduit with a small airspace at the fittings per the the instructions. That being said, I think I am going to use the PE for the new run. Just makes sense i think
  2. S

    I think I screwed up

    1200 sq\ft. 30 x 40 After screwing this up I have seriously considered putting in an electric HWH, as I have a new 200 amp panel in there, but I know the gas hwh will save a lot of money in the long run
  3. S

    I think I screwed up

    CNG: FWIW I have an 1-1\4" line running from the meter to approx 33' across the basement with one elbow and 16' of 3\4" line from there to the farthest appliance. I rounded up to 50' and at an 1-1\4" line, according to the chart, I have approx 588 total CFH available. Total appliance load is...
  4. S

    I think I screwed up

    What chart are you looking at? I would really like to figure this out myself if I can. I am starting to think about an electric THWH. LOL
  5. S

    I think I screwed up

    Thank you guys for the heads up. I will call them in the morning to see what they say. BTW, an online calculator I found says I would only have approx 22,000 BTU's at the garage for the 120k HWH. What an idiot I am Why are you guys against the CSST pipe?
  6. S

    I think I screwed up

    According to that chart a 1" line would give me 149,000 BTU's. According to the chart in the Takagi manual, I would need a 3\4" line. Not sure which is correct, but I will be safe with a 1" I would think.
  7. S

    I think I screwed up

    HMM. Sounds like I am digging a new trench. :mad: I just ordered a 1" CSST line and fittings. Don't want to have to do this again. Wish there was an icon for me kicking myself in my own ***
  8. S

    I think I screwed up

    I know, but I still should have done more research on the size of the line. Just too much going on at the time and I thought I was good. :mad:
  9. S

    I think I screwed up

    I ran a 1\2" gas line out to my new garage for my radiant heat setup and I am pretty sure I need a bigger gas line. Hopefully someone here can tell me for sure. Here are the specs: Takagii T-H3M-DV-N THWH. 5.0w.c. min and 10.5 wc max Run is 70-75' from the house. 1-1\4" gas line pretty much up...
  10. S

    Radiant Floor Heat Design Help

    That was a drawing I made based off of what I thought I needed at the time. Still have a lot to learn when it comes to this setup. My shop is pretty much finished now and I will be starting on the Radiant heat setup soon. To answer your question I did not run the temperature prob and I will...
  11. S

    Smuth's 30x40 Woodshop finally under way

    Here are a few of the finished product. Not the greatest pics, but I am having the roof put on soon so I will post more finished pics later this week.
  12. S

    Smuth's 30x40 Woodshop finally under way

    The roughers came over Friday afternoon to finish the gable ends in time for the crane at 7am Saturday. It only took an hour to set all of the trusses with the crane. Myself and three other guys finished the framing by 4pm. I was pretty much the cut man and clean up guy, but I helped where I could
  13. S

    Smuth's 30x40 Woodshop finally under way

    Last Saturday we framed in the walls and one of the end gables
  14. S

    Smuth's 30x40 Woodshop finally under way

    Slab was poured today. had them add the fiber mesh instead wire mesh. Cost me half as much and saved me some time. Pressure hasn't moved :rocker:
  15. S

    Smuth's 30x40 Woodshop finally under way

    Ended up shortening the first loop and then shortening the other three before running them. Pressure holding well
  16. S

    PEX Layout help Please!!!

    Thanks Walrus that makes me feel a little better. At this point it will not be too much work to shorten the first loop a little and that way I can stay within the 10%
  17. S

    PEX Layout help Please!!!

    30 x 40 garage Ran into a problem with my pex layout today. I obviously did not do my homework and in my rush to get this done before Saturday I ran into an immediate problem. I ran the first loop at the full 300' and then started running the second loop. We got half way done with the floor...
  18. S

    Smuth's 30x40 Woodshop finally under way

    Ran into a problem with the pex layout. I obviously did not do my homework and in my rush to get this done before Saturday ran into an immediate problem. I ran the first loop at the full 300' and then started running the second loop. We got half way done and had a lot of the second loop left and...
  19. S

    Smuth's 30x40 Woodshop finally under way

    A few updates. Moved the sand around and compacted it down. inspection passed. Put the 6 mil vapor barrier down and then the 2" foam, taped the joints.