We have an engineered cold formed building going up shortly, the drawings specify #4 rebar in the footings (we are using #5) and wire mesh in the field on a monolithic slab. Contractor initially tried telling me they would "Pull up" the mesh but I insisted on chairs at the suggestion of the...