I'm in the late stages of an addition we are building onto our house. Long story short, I've got to cut a new 1.5" hole in the back of my main disconnect outside and feed #1AWG/3 SER through it, the exterior plywood, then up the studs, over some ceiling joists about fifteen feet and drop it down...