We had our hand over on a nice wet afternoon.
First impressions of the actual build quality are mixed.
Cabinetry very good...although one top draw in the office just scrapes the benchtop when it opens and the metal draw bodies are a bone colour not white.
Everything else so far is spot on.
Flooring very good. However a couple of the bedroom doorways you can feel the saw tooth through the carpet and the the ensuite entry where the bedroom carpet meets the tiles has had the carpet pulled too tight and it has just exposed the backing material of the carpet. The should be able to fix it by putting an edge strip on it.
Tiling is 100% first class. I had a feeling when I met with the tiler to discuss the layout that he was very switched on.
General fit out in regards to plastering and trims is very good and you can see a lot of attention to detail.
Pretty happy with the lighting and wiring detail, which was our baby so it is hard to complain if we didn't like it!
All services, hot water, heating, treatment plant, roller doors etc work as you would expect.
The Daikin ducted heating system works extremely well. The house is well insulated so that would help. But it is a bit louder than I had anticipated, it think a panel on the steel body is a bit loose and it rattles every now and then. Ill have a look when I can walk out there without getting bogged.
Its only been 2 days but so far zero condensation and the conditions for it have been there, so we are happy about that.
The only disappointing aspect of the finish is the paint work.
Being a spray painter by trade perhaps I expect too much in regards to finish but I'll just say his paint work is rough at best.
He hasn't taken the time to clean up any poor edging around the windows or anywhere for that matter when he has cut the paint in.
His arch's and skirting painting is a bit thin in places and he hasn't even wiped the dust off before painting them in some sections.
All the doors are coated ok but again a few of them have the odd small run, nothing major but just lacking attention to detail or pride in his workmanship.
The front door is appalling.
I'll get some photos when I get time.
But overall we are happy with it and those few minor detail I am sure the builder will rectify when I get him back out here and show him.
No photos of the dirt work yet but we spent all the first day spreading 80t of gravel with a mini skid steer bobcat. It was a wet and wild day. One bogged truck and I even dropped the little bobcat into a hole where I shouldn't have been and got it bogged at one stage

But we managed to get the driveway and car parking spaces usable and livable for now.
Some pics of the inside. They were taken at night under lights so the colouring is really weird for some reason. They all look a bit brown, however the greys are a little bit 'cooler' than the pics would suggest.
Entry
'Theatre' Room
Pantry (Some top cupboards are to be installed here)
Kitchen
Office (some top cupboards are to be installed here)
Hallway and Linen
Some Bedroom pics.....not all of them but you get the idea!
Ensuite
Main Bathroom
Main Dunny
Laundry (this has an indoor clothesline and shelving system to be fitted)
And finally the Lounge/Dining area
As soon as the truck hire place opens Ill pick up the removalist truck and start hauling everything over.
No pics of the garages yet...........they will come
