Mr onetwo
Well-known member
Is there any reason within the code where this arrangement would be prohibited? Will it be ok to transition from rigid to PVC at the bottom of the mast? Sch 40 or sch 80 pvc? Do I need any more ground rods than the 2 shown because the panel is on the other side of the container? The 150 amp load will be passing thru to my shop. I am assuming 3 wire URD to the meter and 4 wire SER to the panel...MHF going underground over to the shop.The container will have a couple of 15 amp circuits for lights, cameras and a future gate operator.





Last edited:











I cobbled up the rest with a bunch of stuff I pulled out of my old garage.