Well I checked my phone and I actually called them Thursday evening the 13th when they told me it was going to be 6 weeks. So I didn't dig the last trench seeing as I had plenty of time.... Then Friday morning they showed up, the crew said they were contractors and everyone tells them they were told 8 weeks.
I talked with them quickly and said I would start digging my last trench while they worked. I waited for them to disconnect the power before I started digging because why not. While waiting for the power to be shut off I used the vacuum to pull some mule tape through the conduit I had dug a few nights before.
Their wire comes pre installed in conduit on this big spool.
Plenty of water in the trench from all the melted ice the week before. This trench to the pole was dug right next to the house feeder and worked out perfect. After digging the house feeder was visible in a few places which made pulling it back easy.
Tied a few half hitches on the house feeder.
Pulled through no problem. No problem connecting the wires, they loaned me their ratcheting cutters to use instead of my sawzall.
After connecting the house feeders I worked on connecting the pump house wiring. The PVC was already somewhat glued so only needed to drill the hole and install everything.
Finished up my side about the same time they finished up their install. Instead of coming up in the middle of the panel they came up on the right side where my jumper wires were installed so they disconnected my wires, which I had just torqued) to fight theirs into place then reconnect mine. All that extra fighting because they dug their trench too close to the concrete and couldn't pull around the corner.
Then they took the old meter off the pole and popped it in the 320amp meter base. I asked if the 320a meter was coming later and they didn't know.
The following Tuesday I called the electric co-op and was told unequivocally that they don't have any 320a meters and this is all they do.
So I went from wanting 400 amps and being told this would be 320amp(400amp surge) to getting 200amps and being told its good for 320amps which is 320amp surge. I can't believe how much they lied and how it seems there is no recourse, absolutely infuriating, with them saying "its our equipment so its not your problem" "is there a problem with the service"