I just wanted to be a bit more comfortable working in my garage. You know-- not be soaking wet and raining sweat on everything. Last winter it was the opposite; it was all I could do to keep a grip on a wrench with my frozen fingers. I got a 5000w electric heater that I could place next to me, and that held the frostbite at bay. But all the heat would just blow right out of my well ventillated roof.
So I was determined to add a heating and cooling system. Thus began the ordeal of navigating the maze of new building codes and energy conservation regulations that don't care if you want to be comfortable in your workshop. It turns out that to be comfortable, you are required to seal the place up like a space ship and have R9zillion insulation. And of course you have to finish the interior walls, which means all that electrical and plumbing you were planning on doing someday has to be done now, before you are allowed to be comfortable.
So then I set about installing all that electrical and plumbing so that I could insulate and close the walls up so that I could add a heater, except by this time it was the middle of summer and I didn't need a heater, I needed an air conditioner. The obvious solution would be a heat pump. And because mini-split heat pumps are all the craze now, because they're so easy to install, I decided that was for me too. But not just any mini-split heat pump... I would have a multi-zone system to handle both my shop and the loft above.
This thread doesn't bother you with all the other stuff I have had to do and still need to do, like insulation, drywall, plumbing in a new bathroom and such. This thread just chronicals my rather 'un-typical' mini-split installation.
So I was determined to add a heating and cooling system. Thus began the ordeal of navigating the maze of new building codes and energy conservation regulations that don't care if you want to be comfortable in your workshop. It turns out that to be comfortable, you are required to seal the place up like a space ship and have R9zillion insulation. And of course you have to finish the interior walls, which means all that electrical and plumbing you were planning on doing someday has to be done now, before you are allowed to be comfortable.
So then I set about installing all that electrical and plumbing so that I could insulate and close the walls up so that I could add a heater, except by this time it was the middle of summer and I didn't need a heater, I needed an air conditioner. The obvious solution would be a heat pump. And because mini-split heat pumps are all the craze now, because they're so easy to install, I decided that was for me too. But not just any mini-split heat pump... I would have a multi-zone system to handle both my shop and the loft above.
This thread doesn't bother you with all the other stuff I have had to do and still need to do, like insulation, drywall, plumbing in a new bathroom and such. This thread just chronicals my rather 'un-typical' mini-split installation.