Regarding my scissor truss gable end engineering plans. Is my gable end scissor truss being delivered with a flat bottom piece of lumber on it? It’s being delivered Monday and I’m trying to wrap my head around it. I circled the piece in question.
 

Attachments

  • IMG_6939.jpeg
    IMG_6939.jpeg
    359.3 KB · Views: 114
To avoid these ads, REGISTER NOW!
OP
M

markomarko

Member
Joined
Jul 18, 2026
Messages
13
Yes that is what I’m expecting to do. I just wasn’t sure what that was on the engineering they sent me. It was throwing me off.
 

mike93lx

ALLIANCE MEMBER
Joined
Dec 9, 2013
Messages
38,117
Location
Richmond, VA
Why would there be a scissor truss on the end wall. Seems like a standard truss matching the roof line and a standard wall would be a he11 of a lot easier.
That makes it hard to properly brace the trusses and tie in the ceiling. Check out the link I provided above.

The Gable framing needs to match the ceiling profile
 

Firebrick43

Well-known member
Joined
May 12, 2015
Messages
14,261
Location
West central Indiana
OP
M

markomarko

Member
Joined
Jul 18, 2026
Messages
13
Another thing I just thought of. If I balloon frame, what’s keeping the exterior walls from kicking out since there’s no double top plate under the scissor truss?
 

PCustoms

Well-known member
Joined
Jul 23, 2011
Messages
23,692
Location
VT
Another thing I just thought of. If I balloon frame, what’s keeping the exterior walls from kicking out since there’s no double top plate under the scissor truss?

Huh?

Double top plate isn't about walls kicking out, it's about proper load transfer from roof to wall framing.

You have 8+ feet of 2x material continuously framed up and attached to the truss, which is tied back to the rest of the roof trusses. Why would the wall "kick out"?
 

mike93lx

ALLIANCE MEMBER
Joined
Dec 9, 2013
Messages
38,117
Location
Richmond, VA
Huh?

Double top plate isn't about walls kicking out, it's about proper load transfer from roof to wall framing.

You have 8' feet of 2x material continuously framed up and attached to the truss, which is tied back to the rest of the roof trusses. Why would the wall "kick out"?
And there is almost no downward load on that wall.

@markomarko it feels like you are getting way ahead of yourself on this build. You have trusses showing up but don't know how to frame the walls. How was the building designed?
 
To avoid these ads, REGISTER NOW!

PCustoms

Well-known member
Joined
Jul 23, 2011
Messages
23,692
Location
VT

firebirdparts

Well-known member
Joined
Jun 8, 2016
Messages
10,689
Location
Kingsport, TN
That’s not a truss pictured, so it’s very weak. That is why you need that brace.

Just to be clear, I am intending my response to be on topic. I am not making commentary on balloon framing but rather delivery
 
Last edited:
OP
M

markomarko

Member
Joined
Jul 18, 2026
Messages
13
Thank you for all the reply guys. Me and my friend put up all my standard trusses today. I framed out the gable end rake. I ended up doubling up the 2x on the gable end overhang so the r6 will **** up to it and then the next set of 2x for the overhang will be able to catch the vinyl soffit.

My friend and I will be putting up the scissor trusses tomorrow. We did everything just the two of us with a third friend helping out halfway through the day. The first gable end was very heavy to lift but it’s all set.
 

Attachments

  • IMG_7032.jpeg
    IMG_7032.jpeg
    1.1 MB · Views: 48
  • IMG_7033.jpeg
    IMG_7033.jpeg
    927.6 KB · Views: 44
  • IMG_7040.jpeg
    IMG_7040.jpeg
    924.1 KB · Views: 43
  • IMG_7046.jpeg
    IMG_7046.jpeg
    947.7 KB · Views: 41
  • IMG_7035.jpeg
    IMG_7035.jpeg
    1.2 MB · Views: 44

mike93lx

ALLIANCE MEMBER
Joined
Dec 9, 2013
Messages
38,117
Location
Richmond, VA
Looks like it's time for blocking.

I'd use the same size lumber as the bottom chord of the scissor truss and mount it, aligned with the scissor truss bottom chord, to the standard truss. Tie in the bracing to that.
 

Firebrick43

Well-known member
Joined
May 12, 2015
Messages
14,261
Location
West central Indiana
The ceiling is very much a part the system.

Bracing can be used in lieu of the ceiling diaphragm if properly placed on the lower chords. There should be a bracing diagram with the trusses unless you told the engineer you were putting in a ceiling
 
OP
M

markomarko

Member
Joined
Jul 18, 2026
Messages
13
How we placed the scissor after the standard. We will have to figure out how to place a ledge for the Sheetrock to catch onto on the standard truss.
 

Attachments

  • IMG_7064.jpeg
    IMG_7064.jpeg
    1.2 MB · Views: 8
  • IMG_7062.jpeg
    IMG_7062.jpeg
    708.5 KB · Views: 8
  • IMG_7079.jpeg
    IMG_7079.jpeg
    951.1 KB · Views: 9

MongoTA

Well-known member
Joined
Mar 10, 2018
Messages
1,018
Location
CT
Regarding my scissor truss gable end engineering plans. Is my gable end scissor truss being delivered with a flat bottom piece of lumber on it? It’s being delivered Monday and I’m trying to wrap my head around it. I circled the piece in question.
The part circled in red is to help the truss designer with layout, it's likely that it should have been deleted from the end drawing.
 