I converted an old autoshop/garage into a restaurant awhile back.
I got to the project late, and all the good stuff was gone..................
Those dang Demo guys, sheesh, they always get first dibs.
I don't want to sidetrack your thread too bad, but I have a funny story that you can appreciate.
In all of our contracts, it is written that all remaining property and materials becomes our property once the contract is signed, every piece of furniture, decoration, lumber, screws, etc.
We got a contract to do select demo on two historical buildings downtown. One of them being a hotel that was built in the 19-teens, and has been, for the most part, untouched for nearly a century. The original bid included salvaging the original doors for the owner. The owner didn't want that included, so we wrote it out of the bid and he signed it.
Now fast forward, I was sent over to pick up over 30 antique doors to bring back to our storage. Half way through loading, the owner shows up claiming they are his doors. He was then reminded that he declined the salvage bid and now they belong to us. In the end, we sold the doors right back to the owner for over a grand, and moved them down the street a couple blocks and unloaded them.
The moral here is, if it belongs to you, you better claim it before the demo guys get that contract.