it top pic,,, the circled in red area,, is where I would want to tie in.. on the posts. the last roof truss,,,is nailed to the outside of the truss,,, along with the other 2z4's going down the posts every 2ft to the ground. The osb is nailed to the 2x4's,,, so there is a space between the osb...