Made some progress. Got the foundation poured and backfilled. Guys did a great job on the foundation, its spot on. Then the 10 wheelers started rolling, 200 yards of road base gravel compacted every 12" to the top. Insulation is ready to go in along with the pex. Got the mud all rough graded and...