Made some progress, doesn't look like much but electrical, vapor berrier sure took me a long time.
Garage door installed with high lift. It keeps the door 5-8 inches from the ceiling.
Also sheeted the ceiling, fron and back wall with 1/2 inch plywood, and installed the mezzanine.
Still have to...