Search results

  1. M

    How fast did your shop go up?

    About 2 months for me - but I was held up waiting for the garage door I ordered from Clopay. Ends up it was sitting here in Atlanta for 3 weeks - and the company didn't notify me about it being ready for delivery. Good thing I called Clopay asking why it was taking so long!
  2. M

    Routing romex through top plates and etc?

    I'm starting to run my romex wiring in my new shop building and have some questions/comments as to what is/isn't code mandated. This is the largest wiring effort I've ever done. Anything previous in houses, etc was typically just adding an outlet or ceiling fan wiring - so this is rather...
  3. M

    Keter Work Table $49 at Walmart

    Just got back from the Duluth GA Sams location. I picked up 2 for me and 1 as a gift to the neighbor that has helped me construct my workshop building. They were $49.88 each. There were about 6 or 7 left - and I had been told 28 at the Tucker GA location. I popped one open once home to...
  4. M

    DIY Wire Reel?

    This does however require an internal wall.
  5. M

    DIY Wire Reel?

    Here are two pictures of the reel I explained above. Like I said - it's not pretty - but it works great. The extra 2x4 placed aside the reel was to fill the gap from the 2x6 width. It helps keep the disc from free-spinning:
  6. M

    DIY Wire Reel?

    I just made my own this past week - as I am starting the wiring task for my shop now. I cut two pieces of OSB into rough circular shapes and drilled a 1/2 hole in the middle for it to spin on some EMT. I then took a 2x4 and cut 4 pieces down to about 4" in length - glued them in the center of 1...
  7. M

    Mystery Hardware Question

    Exactly! I bought an opened (and resealed) trimmer head package at Lowes that was on clearance. I got it home and there was ONE adapter left in the package. Of course - not one that would work with my trimmer model. :(
  8. M

    Legacy Industrial Black Friday Offering

    Thanks for the product selection assistance Scotty! I just placed my order for 20 Gallons of the tinted 6500 sealer.
  9. M

    2 bulb or 4 bulb fixture?

    I've been shopping for lights for my shop that I'm building and was interested in your recommendation - as I have noticed you have provided a lot of useful information on the subject of lighting. Have you looked at the reviews for those lamps you keep recommending? - "Don't buy these", "Not...
  10. M

    Work Bench Outlets.

    Outlets on the underside of a workbench are fine - depending on what type of work you do! I worked as an engineer at a very large communications company as my first employer out of college. They had outlets on the underside of all of their technician benches similar to the pictures posted...
  11. M

    Anyone see any issues with wiring?

    I would have thought someone would mention to use pigtails for the outlets.
  12. M

    Rafter question

    My 38' wide shop has 6/12 pitch trusses and allow for the attic storage room to be almost 8' high - 10' wide.
  13. M

    Best Way to Hang a Shelf from Ceiling?

    I'd recommend placing a 2 x 6 alongside the 2 x 4 with the wedge cut ends that overlaps the joint to the 2 x that is attached to the ceiling. Use wood screws though the side. That will reinforce the attachment and remove any doubt of the existing attachment failing.
  14. M

    New guy with framing questions

    2x6 or 2x8 would be standard for the header - double'd up of coarse to fill the 4" wall thickness. 2x4 won't cut an inspection. single 2x4 for window bottoms is standard - that is just a nailing ledge for the bottom window frame/ledge.
  15. M

    Home Depot will match the Lowes 5% Off Offer

    Anything bought at Lowes is automatically discounted 5% when you use the Lowes credit card. HD will match the 5% discount when you use your HD card at HD, but you have to ask for the discount.
  16. M

    Home Depot will match the Lowes 5% Off Offer

    I found out about this just two weeks ago when purchasing material for my shop build at HD. I happened to mention the Lowes 5% discount and the assistant in the door/window dept said all I had to do was ask and they would match it. I've probably asked for it 5 or 6 times since - they even have...
  17. M

    Ordering lumber for my garage build

    I'd suggest you shop around. So far on my build, I've purchased framing lumber and roof decking (Techshield type) from a local lumberyard, OSB sheathing and the entry door from Lowes, and the architectural shingles and windows from Home Depot. The lumberyard was $2/sheet cheaper than others...
  18. M

    Metal band saw question

    My guess - tension probably too low and tracking not adjusted correctly.
  19. M

    Concrete quoted... now questions & tips

    My 38' X 60' pad with 18" deep footings, 4" pad, 4k psi with fiber was <$10k
  20. M

    New guy with framing questions

    I'm at the very beginning of framing my new 38x60 (10' walls) shop - so this is a very timely thread! I'd like clarification for question 3 asked by the OP. I've already laid out the sill plate 2x4s and drilled for the j-bolts. I didn't pay attention to where they fell end to end. I've laid...
Top Bottom