Got quite a bit done on the bathroom. A friend gave me this full size water heater a few years ago. I’m thinking I’ll want the additional size for the washing machine.
I drew a drywall layout template and cut on the laser so I would get it right (enough) the first time. Worked well.
Paint and flooring went well. I painted some of the trim items a satin black.
The sewer main moved on us when compacting the soil. This resulted in the sewer stack being about 10.5” rough in from the finished wall instead of the standard 12”. Luckily they make 10” rough in toilets.
I bought this restaurant style sink when I bought the shop. It’s turning out well.
I cut a chunk of 1/4” aluminum plate to serve as a shelf for soap and stuff.
Still have to run some power from the main panel. So much work.
Happy Fourth!!