So how much more do you have to do before you start doing the roof and outside walls?
Almost there. I need to have all the eve, soffit, etc framing and the strongbacks done. Trying to get there this week so I can go get decking. The plan then is to deck, paper and shingle, facia, soffit, doors/windows, siding. Delays - It's always something - have to take the truck in Monday to the dealer to replace the right rear window lift gizmo - $370 out of the budget for that.

Playing hurt with a tooth losing a filling and exposing the nerve. Dentist on vacation for 2 weeks, then that'll be another $300+ easy. Self insured on dental - double ouch.
Got a lot done this weekend - the gables are all framed out for soffits.
Started on the long wall soffits, but I'll need more 2x6s to finish there.
Corners - err, cornice returns - framed.
Strongbacks started - trying to get all the "up" work done, then finish the lower soffits.
All work and no play makes Chris a hungry boy. Break time or Sunday supper. Chew on the left side and it'll be OK,