I had a tooth filled this AM. Well, the dentist is near Home Depot and I couldn't eat lunch just yet and I knew HD had a partial spool of 2-2-2-4 aluminum and that they can't sell cuts on 2-2-2-4 after the existing cuts are gone, only whole spools of 500' and...
So I made a stop and had them drag down the partial and helped the guy spool it off through the meter. I made off with 130' and the reel was tagged at 1.47 /ft. This is the good stuff, with the proper rating for wet locations (USE-2). I had my eye on a 24 slot Square D box at Lowes for $80 but I spied a 20 slot at HD for $48, plus buying a grounding bar. $245 total out the door. I only need right at 100' of feed wire, but better 30' extra feet than 6" short. Copper #4 would have been better - but the only way to buy it and get a price is to buy 500' - that'd be $450 for the roll. I'll breaker the feed at 70 or 90 depending on the breaker price and availability. 70 is really plenty.
The filling was $168, I told the wife not to take that out of the building fund!
So I made a stop and had them drag down the partial and helped the guy spool it off through the meter. I made off with 130' and the reel was tagged at 1.47 /ft. This is the good stuff, with the proper rating for wet locations (USE-2). I had my eye on a 24 slot Square D box at Lowes for $80 but I spied a 20 slot at HD for $48, plus buying a grounding bar. $245 total out the door. I only need right at 100' of feed wire, but better 30' extra feet than 6" short. Copper #4 would have been better - but the only way to buy it and get a price is to buy 500' - that'd be $450 for the roll. I'll breaker the feed at 70 or 90 depending on the breaker price and availability. 70 is really plenty.
The filling was $168, I told the wife not to take that out of the building fund!
Last edited:

The siding goes right on the studs with no backer, so I wanted to get the roof dried in before starting to finish out the lower sections.