So the last month has been fun between weather, mud season, crazy work and ever changing family schedules. The contractor did finish up *most* of the items they are responsible for, other than the transom window, loft door, and stairs to the second floor. That is until I started taking some measurements to insulate the skirt boards...
For some reason the left and right walls on either side of the front door didn't seem to measure the same. At first I thought it may have been the beers I drank while grilling dinner, or the cheap Kobalt tape measure I was using, but even after 4 or 5 more beers and about as many tape measures, I kept ending up at the same result. Right wall - 109.5" to the opening. Left wall - 114" to the opening. Garage door opening - 11'6".
After a few more beers I finally accepted that the left side post for the garage door was not where it should be. The crazy part was the skirt board on that side was cut to the correct length as was the box beam above, they just didn't land on the 6x6 at the right spot.
Ensue lots of swearing, a few more beers, and (at this point its probably 1130 at night) a stomping walk back to the house to sleep on the situation. The thing that put me over the edge was that they could clearly see it was wrong and it didn't match the plans and could have been corrected before I ever back filled the posts! At this point I was ready for a battle with the contractor about how to fix things, but thought it better to just go to bed!
Aside from this, I made some decent scores over the past month, including 20 - 6'x92' rolls of insulation for free, all the second hand guys seem to be out of 2" rigid foam to put under the slab though, still waiting to score something there! Hopeful to start making progress again soon!