I'll try and keep this story of failure short. I've got a footprint issue in a small IDF room. Problem being required clearances for all the electrical panels and data cabinets, we're talking a couple inches makes all the difference.
This little project was nothing more then stacking a extended runtime battery on top of the UPS, no problem right?. Build a little table, bolt **** down and off we go. So I built the support frame before actually unwrapping the battery cabinet and image my surprise when I find out the connection cable is just a weeeeee bit short for doing this vertically.
Ahhhh no big deal I'll just get a extension cord. Ya well that cord just happened to cost a grand which in of its self wasn't the deal killer, what was - was a leadtime of 5 weeks
So what's a guy to do except lose sleep over it for a couple days. A couple days after posting this I decided to see just how short the cable was and if I could make it work. So with great trepidation I decided to chance ripping some 1/2" plywood down and stacking this 350lb $8K battery cabinet over the top of a $20K UPS in hopes it doesn't damage the cabinet and SEE just what I was in for.
Perfectly safe right?

As it turns out it BARELY fit......but it fit.
So off we go with a table design that keeps the distance between the top of the UPS and the bottom of the battery cabinet down to less than 1/2"
Well what ya know I happen to have some 3/16" plate in the shop and I'll just build a frame that supports the length of the shelf and then strong back the top so it can't bow.

Sounded good and was good all the way until it came time to build it. I just don't get out in the shop all that often anymore. I get the new frame cut and ready to melt but what's the first thing that happens, batteries die for my helmet (there goes an hour closing up shop and off to the store). Then I didn't get but one corner done when this catastrophe happened - the dreaded empty spool

Not having another couple hours to lose getting a spool (this thing has got to be installed in the morning) I dig thru the ole misc welding drawer and whatta ya know I find myself a small roll of .023. Gee, how old is this stuff, gotta be at least 20 years old and the packing is kinda of in tact, lets run it!
I don't even want to discuss the **** show that followed. I have no idea what was up but I tried everything to get a decent bead. No matter what I did to get decent penetration, she was a spitter. And none of us like a spitter right?


Long story short its done and installed and when I finish up that room over the next couple days it will all make sense.