The stud cavity I am filling is 9’ so I’ll have 2 full 48” batts and a 12” section to fill the cavity. Is there any specific guidelines as far as what order to put them in? Should I be concerned if the joint in the exterior sheathing lines up with the joint of the insulation batts? I think...