I'm told you want fill only, no cuts, for drainage reasons. We got probably an inch of rain in 30 minutes here yesterday, and based on the layout of my lot/pad area, if my garage were already built, with a 15" cut to deal with an overall 30" slope, it would likely have been flooded.